Local weather today
 

 
 


World Wide Clock


 

 

 

 Details in this web-site
 are given in good faith,
 and without guarantee.

 

 


Photo: MPP pallet carrier »Norland«

SOLD April 2010 to Lebanese buyer
through Maretec.

SOLD »NORLAND«
Type MPP General cargo / Pallet carrier cooling and partly reefer (with side door / crane and derriks)
Built Nov. 1976 in Norway - 1982 Norway
Rebuilt 1982 lengthened in Norway
 
Dec. 2004 / Jan. 2005 the tank top and middle deck insolate for cooling in Denmark. According to owners it cools down to 0 deg. C.
Freezing area on main deck upgraded in Jan. 2005.

 
Class DNV, +1A1, R 280, EO, Ice C, KMC, E0
Dim. 86,74 x 14,50 m
Tonnage Deadweight 1710 MT - BT 2655 - NT: 796
Main Engine B&W Alpha Diesel,  3432 Bhp (NEW 1983)
(Totally overhauled 2002 - 2005)
Max. speed: 15 knots
Service speed: 14 knots
Bow prop. 330 hp Brunvoll side thruster forward
Cargo hold Total Volume: 5475 m3 
Total Area: 2548 m2
Pallets: 1999 Euro-pallets
 
Weatherdeck: 548 m2
Main deck: 600 m3
Main deck freezing room (Jan. 2005): 241 m3
Middle deck cooling (Jan 2005): 680 m3
Tank Top (dry cargo Jan 2005): 479 m3
 
Container 32 TEU
Cranes 1 x derrick 40 MT x 17 m
1 x crane 12 MT x 14,5 m
Pallet lifts 2 pallet elevators 4 MT each
Side door 5,70 x 4,80 m side door
Trucks Electric forklift trucks
Electronics Fully equipped with modern electronics on the bridge
Various Main engine + aux. engine totally overhauled 2002 and 2005. - Main eingine checked Dec. 2008.
 
In Jan. 2005 owners insulated + fitted the tank top + middle deck for cooling. The cooling includes 2 new compressors + 4 blowers (fans) each containing 3 fans on each deck (i.e. 2 x 4 x 3 fans). The front part of main deck is for freezing (Jan. 2005).
 
Oct. 2008: Overhaul and renewal of tanktop and general repairs..
 
Price idea SOLD April 2010 to Lebanese buyer
through Maretec.

For further details, please contact our office.

Hit Counter


Sale & Purchase  Newbuildings  .  Conversions  .  Chartering